ABNT 5419 PDF

Abstract: This paper presents the main differences between the new coming version of the Brazilian Standard on Lightning Protection ABNT NBR and IEC. Abnt – Nbr – – Download as PDF File .pdf) or read online. Learn about SPDA & MPS – ABNT Join LinkedIn today for free. See who you know at SPDA & MPS – ABNT , leverage your professional.

Author: Zololrajas Tygobei
Country: South Sudan
Language: English (Spanish)
Genre: Career
Published (Last): 24 December 2010
Pages: 446
PDF File Size: 16.8 Mb
ePub File Size: 6.23 Mb
ISBN: 404-8-54297-299-3
Downloads: 10978
Price: Free* [*Free Regsitration Required]
Uploader: Mushicage

Introduction The load cells in ahnt model and series are primarily designed for the measurement of force More information. Guidelines for a risk management methodology for product design Guidelines for a risk management methodology for product design Viviane Vasconcellos Ferreira Federal University of Santa Catarina viviane nedip.

Components used for wiring New Ng maps for Brazilian standards Southeast region A number of 3 samples of abn copper cable splices were tested with connectors of the split-bolt type.

Civil, mechanical, electro technical More information. For proper graphical presentation of the maps, they were included in a new specific Annex to the Standard. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply.

Sbnt tests were also carried out with higher impulse currents in some of the samples. In spite of the modern and powerful lightning detection and location techniques of today, one must be cautious in adopting new data of this kind in a national standard.

Electrical installations and Brazilian legislation on fire s by Caroline Raduns on Prezi

Lightning current simulation in the laboratory – parameters, procedures and test equipment – Lightning current simulation in the laboratory – parameters, procedures and test equipment – Dipl.

The LPS installed with such rods shall be resized to meet this standard. The current version based on older standards like IEC has 2 pages while the four parts of the new version will amount to about 00 pages. Easy TS is a compact and reliable table top bench designed. In addition to Ng maps with proper graphic quality in the standard, the very same data will be made available on internet through which one can input coordinates and get Ng.

  ESSENTIALS OF INTERNATIONAL RELATIONS MINGST PDF

Franklin Rod Performance 2. Introduction The load cells in the model and series are primarily designed for the measurement of force. An experimental work [12] on joints between abnnt cables of different sizes and cables of same size with anbt connectors gave similar results.

ABNT NBR 5419

Construction of power cables 3. Risk management in scientific research: Embedded Parts Introduction – Anchors In the plant construction or process plants such as chemical, petrochemical, gas or power plants various disciplines are brought into contact and built on each other. In the lack of abny it suggests that Ng be estimated from keraunic levels Td by relation Ng 0.

Pictures 10 and 11 of Part [5] have also been removed.

Pressure monitoring equipment for oil-sf 6. This Section includes grounding and bonding products, design requirements and installation for communications More information.

Xbnt system acts as an electrostatic shield, trying to keep the radius can pierce the armor and hit the building and also reducing the electric fields within it. DEHNconcept Planning of lightning protection systems.

Consequently, it addresses telephone and related systems that More information. Complexity of the different discharge modes.

Keywords Lightning, standards, lightning protection, ground flash density I. Fault location on power cables Fault location on power cables Contents: There is a difference in Table regarding the size of copper conductors used in the form of solid tape, 549 round and stranded.

The new ABNT NBR 5419: Lightning Protection

Scope This Construction Standard covers the grounding and bonding requirements for single phase streetlight systems served by the Looped Radial More information. New Ng maps for Brazilian standards South region. Civil, mechanical, electro technical. Transport General The roof trusses you are about to install have been manufactured to precise engineering standards. Lightning current simulation in the laboratory – parameters, procedures and test equipment – Dipl.

  MANIFIESTO ECOSOCIALISTA MICHAEL LOWY PDF

This is mainly due to the different conditions in the different periods of times the data were raised. All sensor parameters More information. Structural Failures Cost Lives and Time Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures.

Guidelines for a risk management methodology for product design Viviane Vasconcellos Ferreira Federal University of Santa Catarina viviane nedip. Several technical works that point out the differences between the version and the new one have been presented in technical congresses [, 8, ].

To ensure that the trusses perform as designed, it is essential that they be handled, erected. In some samples, additional applications were made 55419 higher currents or duration values.

Its purpose is to convey to the highest abjt of the buildings, the same ionic potential we find in the earth, causing the ray search for the captors to discharge instead of the structures around the xbnt or the soil itself lying at lower levels in relation to the sensors. Building of explosives, flammable, industrial, chemical, nuclear, biochemical laboratories, factories of ammunition and fireworks, telecommunications stations, power plants, industrial heat with risk of fire, refineries, etc.

To make this website work, we log user data and share it with processors.